Wuxi Xidong Domestic Garbage Incineration Power Plant
DATE:31 January 2018
+ . -

ENFI’s subsidiary company Wuxi Xidong Environment Protection and Energy Co., Ltd. adopts BOT model for this project. The operation period of this project is 30 years (including the construction period). This project applies grate furnaces, waste heat boiler and semi-dry offgas treatment. After reaching the design capacity, the waste disposal capacity is 2,000t/d.