Ropeway for Lanzhou Xinglong Mountain in Gansu
DATE:17 November 2017
+ . -

This ropeway was completed in October 2009. It is of the double-cable reversible cabinlift type (with fixed grips), with the horizontal distance of 696.19 m, elevation difference of 94.66 m, one-way transport capacity of 360 people / hour and running speed of 5.23 m / sec.

No bracket is provided for the line, cabinlift is about 200 m above the ground at most, and the independent horizontal rescue system is adopted.

XML 地图 | Sitemap 地图